Site management,born in the field.
With the teams, for the teams.
+0
shift reports
+0
active users
+0
tracking sheets generated
+0
m³ recorded
In production since June 2023
They use Lean Construct




Site reports are still done in Excel.
6 problems you know well.
Data re-entered between departments. Wasted time, multiplied errors.
No consolidation, data not usable.
No data standardization between teams.
Copy-paste, errors that propagate undetected.
Every report = additional manual workload.
Same data re-entered across multiple departments.
90% of data flows through shift reports.
Single entry, validated for all departments.
Site managers
Report entry
Supervision
Control & validation
Database
Centralized & reliable data
Reports, tracking sheets, monthly tables
Quantities, subcontractors, equipment
Excel exports, BIM, third-party systems
The digital site journal
Legal proof of your work — and your field database.
Contractual protection
In case of dispute, the site journal is the reference document. Lean Construct makes it timestamped, signed and tamper-proof. No more paper binders lost at the bottom of a skip.
Exploitable data
The same field entries feed your analytics, BIM exports and automations. One entry, multiplied value.
Two approaches, one single goal.
Digitalize site management.
LC Major
Major Works
Dedicated instance, custom configuration, advanced analytics. For large-scale projects.
- Dedicated instance
- Custom configuration
- Advanced analytics
LC SaaS
Beta programme open
Ready-to-use, multi-trade solution, no complex integration. Join the beta programme.
- Digital site journal
- Multi-project, multi-trade
- Multilingual interface
Essential features
Everything a site supervisor needs.
Staff time tracking
Simple centralized team monitoring.
Site journal
Complete, centralized, historized site journals.
Equipment tracking
Monthly table: arrivals, departures, breakdowns + Excel export.
Subcontractor tracking
Attendance, workforce, hours + Excel export.
Quantity tracking
Concrete, backfill, reinforcement, formwork. Monthly quantities.
Analytics
Real-time visualization vs. contractual timelines.

In production on Lyon-Turin
Lot CO08 — Base tunnel, since June 2023.
