Site management,born in the field.
With the teams, for the teams.
+0
shift reports
+0
active users
+0
tracking sheets generated
+0
m³ recorded
In production since June 2023
They use Lean Construct




Site reports are still done in Excel.
6 problems you know well.
Data re-entered between departments. Wasted time, multiplied errors.
No consolidation, data not usable.
No data standardization between teams.
Copy-paste, errors that propagate undetected.
Every report = additional manual workload.
Same data re-entered across multiple departments.
90% of data flows through shift reports.
Single entry, validated for all departments.
Site managers
Report entry
Supervision
Control & validation
Database
Centralized & reliable data
Reports, tracking sheets, monthly tables
Quantities, subcontractors, equipment
Excel exports, BIM, third-party systems
Two approaches, one single goal.
Digitalize site management.
LC Major
Major Works
Dedicated instance, custom configuration, advanced analytics. For large-scale projects.
- Instance dédiée
- Config sur-mesure
- Analyses avancées
LC SaaS
Construction SMBs & Agencies
Ready-to-use solution, multi-trade, no complex integration. In development.
- Multi-tenant
- Prêt à l'emploi
- Déploiement rapide
Essential features
Everything a site supervisor needs.
Staff time tracking
Simple centralized team monitoring.
Shift reports
Complete, centralized, historized site journals.
Equipment tracking
Monthly table: arrivals, departures, breakdowns + Excel export.
Subcontractor tracking
Attendance, workforce, hours + Excel export.
Quantity tracking
Concrete, backfill, reinforcement, formwork. Monthly quantities.
Analytics
Real-time visualization vs. contractual timelines.

In production on Lyon-Turin
Lot CO08 — Base tunnel, since June 2023.
